Changzhou Cheeron Construction Machinery Equipment Co., LTD
Changzhou Cheeron Construction Machinery Equipment Co., LTD
Email Us

Shanghai East Railway Station Project

Shanghai East Railway Station is located in Pudong New District, Shanghai, China. It has a total construction area of 1.387 million square meters, including 160,000 square meters of high-speed rail station buildings. The planned national and urban rail yards have a total capacity of 15 platforms and 30 lines.


Applications of Split Rebar Couplers

  • Quick connection during segmented hoisting of reinforcement cages

  • Mechanical connection when rebar rotation is impossible


Advantages of CHEERON Couplers

  • No need for rebar rotation: Traditional straight-threaded sleeves require rotating the rebar or sleeve, while the split-thread sleeve allows the sleeve to be tightened directly after the rebar is secured, making it ideal for quick connection of column base reinforcement cages after hoisting.

  • Seismic Performance: The tensile strength meets the standard, and the split-thread design of the double-thread sleeve avoids brittleness in the weld heat-affected zone, making it suitable for seismic resistance in Shanghai's soft soil areas.

  • Solving Space Constraints: Split couplers can be used in confined spaces where welding or tying is difficult in densely packed rebar areas.

Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
Shanghai East Railway Station Project
+86-13376275656
Contact us
We use cookies to optimise and personalise your experience, but you can choose to opt out of non-essential cookies.
To find out more, read our Privacy Policy
Reject All
Accept All