Shanghai East Railway Station is located in Pudong New District, Shanghai, China. It has a total construction area of 1.387 million square meters, including 160,000 square meters of high-speed rail station buildings. The planned national and urban rail yards have a total capacity of 15 platforms and 30 lines.
Quick connection during segmented hoisting of reinforcement cages
Mechanical connection when rebar rotation is impossible
No need for rebar rotation: Traditional straight-threaded sleeves require rotating the rebar or sleeve, while the split-thread sleeve allows the sleeve to be tightened directly after the rebar is secured, making it ideal for quick connection of column base reinforcement cages after hoisting.
Seismic Performance: The tensile strength meets the standard, and the split-thread design of the double-thread sleeve avoids brittleness in the weld heat-affected zone, making it suitable for seismic resistance in Shanghai's soft soil areas.
Solving Space Constraints: Split couplers can be used in confined spaces where welding or tying is difficult in densely packed rebar areas.