For over 25 years, CHEERON has been a dedicated leader in delivering Professional and Reliable rebar connection solutions for critical global infrastructure. In specialized, high-stakes environments like airport construction—where schedules are tight, safety standards are non-negotiable, and space is often limited—the selection of the right mechanical connector is paramount.
The CHEERON MBT Coupler is specifically engineered to meet these challenges. As a non-threaded, mechanically bolted connector, it bypasses the logistical difficulties of traditional splicing methods, offering a solution that is efficient, highly reliable, and built for structural integrity in the most demanding civil engineering applications. The MBT Coupler is designed to join reinforcing steel bars end-to-end without requiring threading or rotation of the bars, making it the ideal choice when one rebar is already fixed or access is restricted.
maximizing-safety-and-speed-the-cheeron-mbt-coupler-in-aviation-construction-china.png)
In critical airport structures—from taxiway bridges to multi-story terminals—the connections between steel bars must guarantee strength and longevity. The CHEERON MBT Coupler is a high-performance system designed to exceed these requirements.
Key Structural Features:
Robust Materials and Certification: Crafted from High-Grade Materials like S45C/40Cr steel, the coupler ensures superior strength and corrosion resistance. It holds Certified Compliance with global standards, including ISO 15835, 9001, and CCC, assuring distributors and construction firms of its quality and dependability.
Superior Seismic Performance: The design is engineered to be Fatigue-resistant, guaranteeing Seismic Performance. This feature is vital for the safety and resilience of all steel bar connection structures in airports, especially those located in seismic zones, as demonstrated by the requirements for its use at Pudong Airport.
Efficiency in Load Transfer: The MBT Coupler excels in applications that require high load-bearing capacity.
At Singapore Changi Airport, the couplers were utilized in connection bridges or high-rise beams to join reinforcing bars to structural steel plates, effectively enhancing shear strength and supporting load transfer—a critical function for elevated or dynamically loaded airport structures.
This blend of material strength and tested structural performance ensures the MBT Coupler contributes directly to the overall structural integrity of the airport's infrastructure.
Airport construction is characterized by complex, multi-phased projects, often requiring work in tight corners, precast sections, or existing structures where rotating rebar is impossible. The non-threaded, bolted design of the CHEERON MBT Coupler is a logistics powerhouse in these environments.
Installation Benefits in Confined Spaces:
No Rebar Rotation Required: The core design feature eliminates the need for expensive threading equipment or the ability to rotate the bar during installation. This makes the MBT Coupler highly effective in areas with limited on-site access, such as the interior of thick columns, deep foundations, or congested beam-column junctions. This capability was a key factor in its suitability for use in connection bridges and high-rise beams at Singapore Changi Airport.
Rapid, Reliable Installation: The coupler is engineered for quick installation, relying on simple mechanical bolting to engage the steel bars. This speed is vital for meeting accelerated project timelines, which is a required specification for its use in airport construction, such as at Pudong Airport.
Versatility in Application: The MBT Coupler's Broad Applications make it ideal for precast concrete segments, a common feature in modern airport terminal and parking structure construction. Its use in projects requiring connections in confined spaces is further highlighted by its application in the supporting infrastructure of the Shanghai East Railway Station.
The ability to maintain safety standards while dramatically simplifying installation in difficult environments underscores the value of the MBT Coupler for both construction teams and global equipment dealers.
For our customers—distributors, factories, and construction companies, the choice of the CHEERON MBT Coupler represents a reliable, commercially sound decision. Our commitment to Pursuing Excellence is backed by our manufacturing scale and technical team.With an annual production capacity of 50 million rebar couplers and a 20,000 square meter facility equipped with over 200 state-of-the-art machines (including machining centers and CNC lathes), CHEERON is positioned to meet the high volume and precision requirements of major airport projects globally.
Our specialized focus on customized, high-quality rebar connectors ensures that every MBT Coupler delivers on its promise of structural integrity.
The successful application of the MBT Coupler in major projects like Pudong Airport and Singapore Changi Airport is not just a track record; it is proof of our product's ability to consistently deliver the required safety, speed, and Seismic Performance necessary for modern, complex aviation infrastructure.